▶
"Installing the top covers" on page
▶
"Sliding the server enclosure into the rack" on page
▶ Install all HDD/SSD modules in the relevant HDD/SSD cages, see
"Installing a 2.5-inch HDD/SSD module" on page
▶ If applicable, install all 2.5-inch HDD/SSD dummy modules into the relevant
cage, see
"Installing a 2.5-inch dummy module" on page
▶ If applicable, install the front bezel, see
page
47.
▶
"Installing server nodes in the server enclosure" on page
▶
"Installing the new hot-plug PSU" on page
▶
"Connecting the power cord" on page
▶
"Switching on the server nodes" on page
7.8
Replacing the HDD/SSD bridge board
Field Replaceable Unit
(FRU)
Tools:
Preliminary and concluding steps: Phillips PH2 / (+) No. 2
hexagonal cross SW5 / PZ2
Main steps: tool-less
Preliminary steps
▶ Shut down the server nodes, see
▶
"Disconnecting the power cord" on page
▶
"Removing the defective hot-plug PSU" on page
▶
"Removing server nodes from the server enclosure" on page
▶ If applicable, remove the front bezel, see
page
48.
CX400 M6
Hard disk drive (HDD) / solid state disk (SSD)
56.
"Installing the front bezel" on
84.
"Shutting down the server" on page
Upgrade and Maintenance Manual
68.
114.
117.
81.
101.
86.
Hardware: 40 minutes
42.
100.
"Removing the front bezel" on
41.
43.
135