Preliminary steps
"Locating the defective server" on page
▶ If applicable, remove the front bezel, see
page
48.
"Locating the defective component" on page
Removing the defective 2.5-inch HDD/SSD module
▶ Remove the HDD/SSD module, see
module" on page
Installing the new 2.5-inch HDD module
▶ Install the HDD/SSD module, see
on page
112.
Concluding steps
▶ If applicable, install the front bezel, see
page
47.
▶ If the HDD/SSD is configured using a RAID controller with a RAID level
higher than "0", the rebuild will start automatically, see
array rebuild" on page
"Updating Server View RAID Manager" on page
7.6

Replacing a 2.5-inch HDD/SSD backplane

Field Replaceable Unit
(FRU)
Tools:
Preliminary and concluding steps: Phillips PH2 / (+) No. 2
Main steps: Phillips PH2 / (+) No. 2
CX400 M6
Hard disk drive (HDD) / solid state disk (SSD)
116.
"Installing 2.5-inch HDD/SSD modules"
89.
Upgrade and Maintenance Manual
39.
"Removing the front bezel" on
40.
"Removing a 2.5-inch HDD/SSD
"Installing the front bezel" on
95.
Hardware: 15 minutes
"Performing a RAID
119