Confirming Apex1000 Power-On Sequencing - Motorola APEX1000 Installation And Operation Manual

All-purpose edge qam
Table of Contents

Advertisement

For DC units:
CAUTION
This unit has up to two (2) 100 –240 V
Disconnecting less than the maximum will not de-energize the system. To reduce the
risk of injury, disconnect all power feeders when removing power to the system.

Confirming APEX1000 Power-on Sequencing

When power is applied, the STATUS LED indicates APEX1000 sequencing as follows:
LED Color
Blinking Red
Blinking Yellow
Blinking Green
Blinking Red and Green
Solid Green
If the STATUS LED is yellow or solid red, but the error does not prevent activating
the APEX1000 EM, proceed to
If the STATUS LED is yellow or solid red and the error precludes activating the
APEX1000 EM to perform the APEX verification, reference
with many common problems.
Installation • Confirming APEX1000 Power-on Sequencing
APEX1000 All-Purpose Edge QAM Software Version 2.4.x • Installation and Operation Manual
573408-001-a
Use the DC power cord assembly provided.
Only connect the DC power cord after all I/O connections are complete. The
power supply automatically senses and adapts to any input from –40 through –
60 V DC.
Connect this equipment directly to the DC supply system earthing electrode
conductor or to a bonding jumper from an earthing terminal bar or bus to which
the DC supply system earthing electrode is connected.
Locate this equipment in the same immediate area (such as adjacent cabinets)
as any other equipment that has a connection between the earthed conductor of
the same DC supply circuit and the earthing conductor, and also the point of
earthing of the DC system. Do not earth the DC system elsewhere.
Place the DC supply source within the same premises as the equipment.
Do not position switching or disconnecting devices in the earthed circuit
conductor between the DC source and the point of connection of the earthing
electrode conductor.
Condition
Initially, the STATUS LED blinks red to indicate the APEX1000 is
performing a memory test.
Sequentially, the STATUS LED blinks yellow to indicate a successful
memory test completion and boot code execution.
The STATUS LED then starts blinking green to indicate that the
application code is configuring the APEX1000 for operation.
Finally, all of the LEDs blink red, and then green.
When the STATUS LED is solid green, it indicates the unit is
operational.
or two (2) –48 V
APEX1000
Verification.
B
input power feeders.
Troubleshooting
for help
37

Advertisement

Table of Contents
loading

Table of Contents