Programming Graph Locations; Communication Confirmation; Problems; Completion - GE Solar 7000 Service Manual

Patient monitor
Table of Contents

Advertisement

Programming Graph
Locations
Communication
Confirmation

Problems?

Completion

Revision J
CONFIGURATION: Configuring a Monitor
1. Execute the following menu sequence, starting from the MAIN
menu:
MONITOR SETUP
GRAPH SETUP
GRAPH LOCATION
MANUAL GRAPH LOCATION
2. Choose the manual graph location from the list and press the Trim
Knob control.
3. Select ALARM GRAPH LOCATION with the Trim Knob control.
4. Choose the alarm graph location from the list and press the Trim
Knob control.
5. Select PRINT WINDOW LOCATION with the Trim Knob control.
6. Choose the print window location from the list and press the Trim
Knob control.
7. Select 12 LEAD PRINT LOCATION with the Trim Knob control.
8. Choose the 12 lead print location from the list and press the Trim
Knob control.
Do the following to confirm communication across the network.
1. Admit and generate a waveform at the monitor with a simulator.
2. Press GRAPH GO/STOP button on the monitor
3. Observe graph output at chosen locations.
If the DDW does not graph, do the following:
Ensure the DDW is turned ON.
Check all cables for a good connection.
Check programmed alarms and manual graph locations at the
monitor.
If you do not have a waveform at the central station, do the following:
Ensure the central station software is a compatible.
Check all cables for a good connection.
Check the programmed alarms and manual graph locations at the
monitor.
Ensure the care unit name is the same in the monitor and in the
central station.
Ensure the central station serial number and LAN address are
programmed correctly.
The monitor is now ready for normal operation. At this time, perform the
"Checkout Procedure" found in Chapter 3: "Maintenance."
Solar 7000/8000/View Patient Monitor
414993-001
6-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solar 8000Solar solarview

Table of Contents