Test Completion

Revision J
MAINTENANCE: Electrical Safety Tests
WARNING
Shock hazard. The following step causes high voltage at
the test body. Do not touch the test body.
2. Set power switch on the device to ON.
3. Read leakage current indicated on DMM.
4. Change the leakage tester polarity switch to the RVS position.
5. Read the leakage current indicated on the DMM.
NOTE
If either reading is greater than the appropriate
specification below, the device under test fails. Contact
GE Medical Systems Information Technologies Technical
Support.
10 µA (0.01 volts on the DMM) at 120 VAC using the test body.
20 µA (0.02 volts on the DMM) at 240 VAC using the test body.
50 µA (0.05 volts on the DMM) at 120-240 VAC using the ECG
cable.
NOTE
The 10 and 20 µA limits are based on internal design
standards. The 50 µA limit is common to all standards.
AAMI ES-1 standard requires using the patient cable.
6. Set the power switch on the device to OFF.
1. Disconnect the leakage tester from the power outlet.
2. Disconnect all test equipment from the device.
3. Disconnect the device power cord from the leakage tester.
Solar 7000/8000/View Patient Monitor
414993-001
3-15