Download Print this page

Heartland VALUE Series Assembly Manual page 81

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x2
SP
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
x2
TP
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
¸
BEGIN
1
Orient parts TP and SP on a flat surface.
Hold parts TP and SP flush and aligned.
Assemble joist with 3" nails in a staggered pattern.
Flush
TP
Flush
2
Turn assembled joist over and repeat staggered nail pattern.
3
Support joist and drill a 7/16" hole through each end (Fig. A).
Repeat steps to build a second loft joist.
LOFT JOISTS
TP
Flush
x28
7/16" (11 mm) Drill Bit
SP
TP
3" (7,6 cm)
Nails
1-3/4"
(4,4 cm)
Fig. A
79
3" (7,6 cm)
Flush
1-3/4"
(4,4 cm)

Advertisement

loading

Related Products for Heartland VALUE Series