Download Print this page

Heartland VALUE Series Assembly Manual page 57

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
Preassembled
BEGIN
1
Measure 2-9/16" (6,5 cm) down from top plate doubler and mark at each side as shown.
Set gable unit on top plate. Fasten with (1) 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
Continue nailing lower edge of panels to wall doubler with 2" nails spaced 6" apart.
2
Secure gable panels to rafter with with 2" nails spaced 6" apart.
3
Working inside, secure gable unit with (2) 3" screws angled into each AF at an angle (Fig. A).
(15,2 cm)
NAIL FIRST
2-9/16"
2" (5,1 cm)
(6,5 cm)
Measure and
Mark
Repeat steps to install the opposite side gable.
FINISH
Your gable units are now installed.
GABLE INSTALLATION
6"
x8
x108
Window hole
of front panel
6"
(15,2 cm)
Fig. A
DOUBLER
3" (7,6 cm)
Screws
55
3" (7,6 cm)
2" (5,1 cm)
AF
2-9/16"
(6,5 cm)
Measure and
Mark
NAIL FIRST
2" (5,1 cm)

Advertisement

loading

Related Products for Heartland VALUE Series