Download Print this page

Heartland VALUE Series Assembly Manual page 19

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x2
23-7/8 x 84"
(60,6 x 213,4 cm)
3
Install the left panel 1-1/2"
from the top plate.
Use a 2x3 spacer for
consistent measurement.
Secure panel with 2" nails
spaced 6" apart
on edges.
4
Install the right panel
flush to installed panel,
as shown.
Ensure 64" (162,8 cm)
door measurement.
Use part OO as a
temporary brace.
Secure with (2) 3"
screws.
Secure panels with 2"
nails spaced 6" apart
on edges.
5
Install (2) 11-7/8" x 84"
panels flush to installed
panels and 1-1/2" from
the top plate.
Secure panels with 2"
nails spaced 6" apart
on edges.
Note the panel
lip-edge/square edge
orientation.
FINISH
Your 12' gable wall with
door is now assembled.
Carefully flip the wall over.
GABLE WALL 01 WITH DOOR
x1
x1
3/4"
(1,9 cm)
3/4" Gauge
Block
Flush
2x3
SQUARE
EDGE
23-7/8"
(60,6 cm)
x2
x166
OO
x1
Temporary Brace
69" (75,3 cm) Door Stiffener
BEGIN HERE
6" (15,2 cm)
Flush
(162,6 cm)
OO
Temporary Brace
3" (7,6 cm)
Screw
1-1/2"
(3,8 cm)
6" (15,2 cm)
Flush
17
3" (7,6 cm)
2" (5,1 cm)
Flush
2x3
Flush
64"
3" (7,6 cm)
Screw
Flush
1-1/2"
(3,8 cm)
3/4" Gauge
Block
3/4"
(1,9 cm)
Flush
2x3
SQUARE
EDGE

Advertisement

loading

Related Products for Heartland VALUE Series