Download Print this page

Heartland VALUE Series Assembly Manual page 37

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x2
2" (5,1 cm)
x1
Temporary Brace
TJ
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
BEGIN
1
Place 2nd 16' wall centered on floor.
The 1-1/2" (3,8 cm) overlap is to the top.
Use TJ as a temporary brace as shown.
Secure TJ with (2) 3" screws.
2
Secure wall with (1) 2" screw through
gable wall panel into 12' wall bottom
and top plates (Fig. A, Fig. B).
Secure wall to bottom plate first.
ENSURE PANEL CORNERS ARE FLUSH.
3
Nail lower edge of wall panels to floor
frame with 2" nails spaced 6" apart.
Angle nails into floor frame (Fig. C).
Secure wall bottom plates to floor
with 3" nails (Fig. C).
2nd 16' EAVE WALL INSTALLATION
x2
x36
(15,2 cm)
2" (5,1 cm)
Nail 2" nails first.
x16
3" (7,6 cm)
2" (5,1 cm)
1-1/2"
(3,8 cm)
TJ
2" (5,1 cm)
Screw
Fig. A
3" (7,6 cm)
Nails
6"
3" (7,6 cm)
Nails
Nails
Fig. C
35
3" (7,6 cm)
3" (7,6 cm)
Screws
2" (5,1 cm)
Screw
Fig. B
Flush

Advertisement

loading

Related Products for Heartland VALUE Series