PARTS REQUIRED:
x2
SP
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
AI
x6
2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm)
x2
TP
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
Pre Assembled Header
x1
BEGIN
Orient parts on edge on floor as shown. Measure and mark from end of boards.
1
Orient Pre Assembled Header as shown (Fig. A).
Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
Fasten (3) middle parts AL to Pre Assembled Header with (2) 3" screws (Fig. B).
2
Fasten (2) end AL to studs AI with (4) 3" nails at each side.
Secure parts AL to top plates with (2) 3" nails at each connection and (4) 3" nails at seam.
48"
(121,9 cm)
37-3/4"
(95,9 cm)
24"
(61 cm)
Flush
SP
AI x6
TP
Flush
GABLE WALL 01 WITH DOOR
x5
AL
2 x 4 x 7" (5,1 x 10,2 x 17,8 cm)
96"
(243,8 cm)
72"
(182,9 cm)
Seam
Pre-Assembled Header
Flush
Seam
UM
96"
(243,8 cm)
x72
x6
x2
UM
2 x 4 x 68" (5,1 x 10,2 x 172,7 cm)
144"
(365,8 cm)
96"
(243,8 cm)
TP
AL x5
3" (7,6 cm)
Screws
Fig. A
Install Header in
this position
3" (7,6 cm)
Screws
Fig. B
UM
64"
(162,6 cm)
16
3" (7,6 cm)
3" (7,6 cm)
37-3/4"
(95,9 cm)
24"
(61 cm)
Flush
1-1/2"
(3,8 cm)
78-1/2"
(199,4 cm)
SP
48"
(121,9 cm)
Flush
Flush