Download Print this page

Heartland VALUE Series Assembly Manual page 34

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x2
SP
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
x2
TJ
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
x2
PT
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
BEGIN
Orient parts on top of wall frames. Measure and mark from end of boards.
1
Secure from top with (2) 3" nails spaced every 24" (Fig. A).
2
Secure from bottom with (2) 3" screws at each corner (Fig. B).
3" (7,6) cm
Nails
Fig. A
Fig. B
3" (7,6) cm
Screws
FINISH
Your wall doublers are now installed.
CONTINUE TO PAGE 51 TO RESUME
CONSTRUCTION OF 12' X 12' SHED.
12' x 12' WALL DOUBLERS INSTALLATION
x2
HVC
2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm)
44-3/8"
(112,7 cm)
48"
(121,9 cm)
96"
PT
(243,8 cm)
x64
x8
HVC
SP
Ensure all doubler seams are non-aligned
over seams of wall top plates.
TJ
92-5/8"
(235,3 cm)
DOOR
32
3" (7,6 cm)
3" (7,6 cm)
92-5/8"
(235,3 cm)
TJ
SP
PT
Nail TYP.
24"
HVC
(61 cm)
44-3/8"
(112,7 cm)
48"
(121,9 cm)
96"
(243,8 cm)

Advertisement

loading

Related Products for Heartland VALUE Series