PARTS REQUIRED
x2
Temporary Brace
TJ
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
x54
2" (5,1 cm)
BEGIN
1
Place 1st 24' eave wall
centered on floor.
The 1-1/2" (3,8 cm) overlap
is to the top.
Use (2) TJ as a temporary brace,
as shown.
Secure TJ with (2) 3" screws.
Secure wall with (1) 2" screw
into 12' wall bottom plate (Fig. A)
and top plate (Fig. B).
Secure wall to bottom plate first.
ENSURE PANEL CORNERS ARE FLUSH.
2
Nail lower edge of panels
to floor with 2" nails
spaced 6" apart.
Angle nails into floor frame
(Fig. C).
Secure panel to 12' wall stud
with 1-1/2" nails spaced 6" apart.
3
Secure wall top plate with (1) 3" screw
at the corner at an angle, as shown
(Fig. D).
FINISH
Your 1st 24' eave wall is now installed.
1st 24' EAVE WALL INSTALLATION
x5
x24
Flush
2" (5,1 cm)
Screw
Fig. A
1-1/2" (3,8 cm)
Nails
6" (15,2 cm)
Nail 2" nails first.
2" (5,1 cm)
Nails
3" (7,6 cm)
3" (7,6 cm)
Fig. B
2" (5,1 cm)
Screw
TJ
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
3" (7,6 cm)
Nails
Fig. C
46
x2
2" (5,1 cm)
x13
1-1/2" (3,8 cm)
3" (7,6 cm)
Screws
TJ
6"
(15,2 cm)
2" (5,1 cm)
Nails
1-1/2"
(3,8 cm)

Advertisement

loading

Related Products for Heartland VALUE Series