Download Print this page

Heartland VALUE Series Assembly Manual page 36

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED
x1
Temporary Brace
TJ
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
x36
2" (5,1 cm)
BEGIN
1
Place 1st 16' eave wall centered on floor.
The 1-1/2" (3,8 cm) overlap is to the top.
Use TJ as a temporary brace as shown.
Secure TJ with (2) 3" screws.
Secure wall with (1) 2" screw into 12' wall
bottom plate (Fig. A) and top plate (Fig. B).
Secure wall to bottom plate first.
ENSURE PANEL CORNERS ARE FLUSH.
2
Nail lower edge of panels to floor
with 2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. C).
Nail panel to 12' wall stud with
1-1/2" nails spaced 6" apart.
3
Secure wall top plate with (1) 3" screw
at the corner at an angle as shown
(Fig. D).
FINISH
Your 1st 16' eave wall is now installed.
1st 16' EAVE WALL INSTALLATION
x3
3" (7,6 cm)
x16
Flush
2" (5,1 cm)
Screw
6" (15,2 cm)
1-1/2" (3,8 cm)
Nail 2" nails first.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Fig. A
Nails
3" (7,6 cm)
Nails
34
x2
2" (5,1 cm)
x13
1-1/2" (3,8 cm)
Fig. B
1-1/2"
(3,8 cm)
TJ
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
6"
(15,2 cm)
2" (5,1 cm)
Nails
2" (5,1 cm)
Screw
3" (7,6 cm)
Screws

Advertisement

loading

Related Products for Heartland VALUE Series