PARTS REQUIRED:
x54
2" (5,1 cm)
Temporary Brace
x2
TJ
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
BEGIN
1
Place 2nd 24' wall centered
on floor.
The 1-1/2" (3,8 cm) overlap
is to the top.
Use TJ as a temporary brace
as shown.
Secure TJ with (2) 3" screws.
2
Secure wall with (1) 2" screw
through gable wall panel
into 12' wall bottom and top plates
(Fig. A, Fig. B).
Secure wall to bottom plate first.
ENSURE PANEL CORNERS ARE FLUSH.
3
Nail lower edge of wall panels to floor
frame with 2" nails spaced 6" apart.
Angle nails into floor frame (Fig. C).
Secure wall bottom plates to floor
with 3" nails (Fig. C).
2nd 24' EAVE WALL INSTALLATION
x4
3" (7,6 cm)
x24
3" (7,6 cm)
Nails
2" (5,1 cm)
Nails
Nail 2" nails first.
Fig. C
3" (7,6 cm)
3" (7,6 cm)
Screws
TJ
2" (5,1 cm)
Screw
Fig. A
3" (7,6 cm)
Nails
47
x2
2" (5,1 cm)
2" (5,1 cm)
Screw
Fig. B
1-1/2"
(3,8 cm)
6"
(15,2 cm)
Flush