Chapter 6: Installing the Switch on a Wall
86
4. Follow these guidelines as you position the switch on the wall:
Position it so that the front panel is facing left or right. Refer to
Figure 8. Do not install it with the front panel facing up or down.
Provide sufficient space from other devices or walls so that you
can access the front and back panels, and for adequate air flow for
ventilation.
Figure 8. Securing the Switch to the Plywood Base
5. Do one of the following:
If you have not installed the power supplies yet, go to Chapter 3,
"Installing the Power Supplies" on page 61.
If any of the switches contain the PWR250-80 DC Power Supply,
go to Chapter 9, "Wiring the DC Connector on the PWR250-80
Power Supply" on page 109.
Otherwise, go to Chapter 7, "Powering On the Switch" on page 91