Start The Cnc/Mmi Software; Start The Calibration Program P650042 - KaVo Everest engine Base Camp 4140 Assembly Instructions Manual

Table of Contents

Advertisement

Assembly instructions Everest
7 Calibrate the Everest engine Base Camp 4140
engine Base Camp 4140
®
The startup program is started. All five axes move for approximately 15 minutes.
After the startup program ends, the Everest engine Base Camp moves to basic
position. The warm up program heats the Everest engine Base Camp to operating
temperature and therefore has to be done once directly before calibration.

7.2.6 Start the CNC/MMI software

▶ In the program Everest Base Camp Control in the menu Machine, select the
submenu Diagnosis, and the menu itemCNC.

7.2.7 Start the calibration program P650042

Note
A new program is used to calibrate the Everest engine Base Camp!
Requirement
The CNC/MMI software is started.
▶ In the "ATUOmatik" menu, click the button "Run program 1" (F2) , and then click
the button "Subsequent block" (F1).
▶ Reclick the AUTOmatic menu.
▶ Click the button "Program number" (F1).
▶ Go to the directory "Calibr" (F4) (path: C:\IBHData\NCProg\Calibr).
|
7.2 Mill the calibration body
33/51

Advertisement

Table of Contents
loading

Table of Contents