Assembly instructions Everest
7 Calibrate the Everest engine Base Camp 4140
engine Base Camp 4140
®
7.4 Calculate the correction values
7.4.1 Start the calibration program "Basecamp_calibration.exe"
▶ Open Windows NT Explorer.
▶ Open the calibration program by double-clicking "engine_calibration.exe" in the
directory "C:\IBHData\NCProg\Calibr".
7.4.2 Run the calculation with "Basecamp_calibration.exe"
▶ Enter name.
▶ Follow program instructions, and enter the measured values Y
Y
and P51
in µm.
0,old
Alt
▶ Record the machine parameters calculated and output by the program on the
form in µm:
Y
(e.g. 23)
0, corr
Y
(e.g. 16054)
0, new
P51
(e.g. -15)
0, corr
P51
(e.g. -101)
new
At the end of the calculation, a message appears that tells you whether or not the
calibration was successful.
|
7.4 Calculate the correction values
45/51
, Y
, Z
, Z
and
1
2
1
2