Backup Box (If Applicable); Meter Setting - Alpha ESS SMILE5 Installation Manual

Table of Contents

Advertisement

INSTALLATION
For AC/Hybrid system, there are two meter needed:
without Meter Plug
Cabinet
Meter1
AlphaESS
RS485 PIN
RS485 PORT
3
6
Figure 46 Two Meter Connect, without Meter Plug
If the ACR10 meter is used as a grid meter, the direction of arrow in CT should point
away from the grid to the energy storage system.
If the ACR10R meter is used as a PV meter in hybrid system, the direction of arrow in CT
should point away from the PV inverter to the energy storage system.

2.3.4 Backup Box (If Applicable)

Backup Box Connect to SMILE5 (single-phase grid in house):
COM
GRID_L1
LOAD_L1
PV-INV_L1
AC_L1
BAK_L1
GRID_L2
L
LOAD_L2
PV-INV_L2
N
GRID
AC_L2
GRID_L3
PE
BAK_L2
PV-INV_L3
LOAD_L3
AC_L3
GRID_N
Ś
BAK_L3
L
PV-INV_N
PV
PV-INV
meter
LOAD_N
N
GRID_PE
BAK_N
PV-INV_PE
DSP_BackupBox
Figure 47 Backup Box Connect to SMILE5 (single-phase grid in house)
Backup Box Connect to SMILE5 (three-phase grid in house):
COM
GRID_L1
L1
PV-INV_L1
L2
GRID
L3
GRID_L2
N
PV-INV_L2
PE
GRID_L3
Ś
L
PV-INV_L3
PV
PV-INV
meter
N
GRID_N
PV-INV_N
GRID_PE
PV-INV_PE
DSP_BackupBox
Figure 48 Backup Box Connect to SMILE5 (three-phase grid in house)
Meter2
Grid Meter
PV Meter
RS485 PORT
21
22
21
22
patch cable
LOAD3
LOAD2
LOAD1
RCD
L
N
AC
Storion-S5
PE
ś
PV
ECO-ES5
SMILE5
AC_N
L
N
BACK
Meter Port
PE
patch cable
Bat
patch cable
LOAD_L1
AC_L1
BAK_L1
LOAD3
LOAD2
LOAD1
LOAD_L2
AC_L2
RCD
BAK_L2
LOAD_L3
AC_L3
L
N
AC
BAK_L3
Storion-S5
PE
ś
PV
LOAD_N
ECO-ES5
AC_N
SMILE5
L
N
BACK
BAK_N
Meter Port
PE
patch cable
Bat
28
29

2.3.5 Meter setting

2.3.5.1 SM60A
0000
0000
kWh
PASS
Step 1 Click the "Enter" button to enter
the menu interface.
CODE
Step 3 You will get into the code
interface. Then click the "Shift" button
to enter the address interface.
CODE
Step 5 Click the "Enter" button to get
back to the menu interface. Then click
the "Shift" button 5 times to enter the
interface for saving.
There are 3 buttons on the front of the
electricity meter:
1. Down arrow: shift button
2. Up arrow: value adjusting
3. Enter button / Menu button
PASS
Step 2 Click the "Enter" button to input the
password. The initial password is 0000.
Then click the "Enter" button.
ADDR
003
Step 4 Please set the meter address by
using the "Value adjusting" button, the Grid
meter (DC, AC and Hybrid system) address
is set to 003, and the PV meter (AC and
Hybrid system) address is set to 004.
ADDR
S-
NO
Step 6 Click the "Shift" button to save the
setting.
INSTALLATION
A-
S-
YES

Advertisement

Table of Contents
loading

Table of Contents