Alpha ESS SMILE5 Installation Manual page 12

Table of Contents

Advertisement

INSTALLATION
Figure 22 Wiring the Battry Power Cable
Step 14 Connect the power cables of the bottom battery from Step 2 to the side
terminals of the top battery. Make sure that red connects to red and black connects to
black.
+
-
+
-
Figure 23 Wiring the Power Cable of the Cable Box
Step 15 Connect the power cables of the bottom battery from Step 2 to the side terminals
of the top battery. Make sure that red connects to red and black connects to black.
Figure 24 PV Wiring
18
19
Step 16 Close the battery front covers and connect the PV-MC4 connectors to the
system (connect on both sides). Connect all AC cables to the distribution box, the meter
communications cable to the meter COM port, and the ethernet cable to the router.
Then close the cable box front cover.
Step 17 Open the front cover of the last battery and remove the DIP cover. Now set the
DIP switch 2 to "on" mode and close the cover again.
1. If there is only one BAT, the DIP switch of this BAT must be set as the following:
Battery
DIP 1
Position
Battery
OFF
2. If there are two or more than two BATs, the DIP switch of the BATs must be set as
the following:
Battery
DIP 1
Position
Non-bottom
OFF
Battery
Bottom
OFF
Battery
Note: The DIP setting is only changed on the last battery.
Figure 25 DIP Operation
DIP 2
DIP 3
DIP 4
ON
OFF
OFF
DIP 2
DIP 3
DIP 4
OFF
OFF
OFF
ON
OFF
OFF
INSTALLATION
DIP
Switch
ON
WE
1 2 3 4
DIP
Switch
ON
WE
1 2 3 4
ON
WE
1 2 3 4

Advertisement

Table of Contents
loading

Table of Contents