Download Print this page

Heartland VALUE Series Assembly Manual page 80

Hide thumbs Also See for VALUE Series:

Advertisement

2
Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge.
2
Roof Deck
FRONT OF
SHED
1"
(2,5 cm)
Notch
- or -
Drip Edge
Notch
Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front,
3
stagger each row.
FRONT OF
SHED
1"
(2,5 cm)
Notch
Flush with rain slots.
4
Continue installing rows of
shingles by staggering at front.
FRONT OF
SHED
Flush with starter row.
1"
(2,5 cm)
Notch
SHINGLES
continued...
Flush with starter row.
78
BACK OF
SHED
BACK OF
SHED
Bend in roof
Flush with rain slots.

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Classic 10 x 10