Download Print this page

Heartland VALUE Series Assembly Manual page 38

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED
x10
2" (5,1 cm)
x26
1-1/2" (3,8 cm)
BEGIN
1
Place 10' gable wall on floor centered between
installed' walls.
Secure wall with 2" screws into top and bottom plates
(Fig. A, Fig. B).
Secure wall to bottom plate first.
ENSURE PANEL CORNERS ARE FLUSH.
Nail lower edge of panels to floor with 2"
2
nails spaced 6" apart.
Angle nails into floor frame (Fig. C).
Nail panels to eave wall studs with
1-1/2" nails spaced 6" apart.
3
Secure wall top plates with 3" screws
at each corner at an angle (Fig. D).
FINISH
Your walls are now installed.
CUT OUT AND REMOVE BOTTOM PLATE AT
DOOR OPENING.
10' GABLE WALL INSTALLATION
x2
3" (7,6 cm)
x8
3" (7,6 cm)
3" (7,6 cm)
Nails
Nail 2" nails first.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
2" (5,1 cm)
Screw
Flush
Screw
Fig. D
36
x4
2" (5,1 cm)
Fig. B
Fig. A
2" (5,1 cm)
Screw
3" (7,6 cm)
Nails
2" (5,1 cm)
Nails
6"
(15,2 cm)
Flush
6"
(15,2 cm)
1-1/2"
(3,8 cm)
Nails

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Classic 10 x 10