PARTS REQUIRED:
x13
1-1/2" (3,8 cm)
BEGIN
Remove temporary brace OO from
1
installed 10' gable wall.
Place 2nd 10' eave wall centered on floor
1-1/2" (3,8 cm) overlap is to the top.
ENSURE PANEL CORNERS ARE FLUSH.
2
Secure wall with (1) 2" screw through
gable wall panel into 10' wall bottom
and top plates (Fig. B, Fig. A).
Secure wall to bottom plate first.
3
Nail lower edge of wall panels
to floor frame with 2" nails
spaced 6" apart.
Angle nails into floor frame
(Fig. C).
Secure wall bottom plates to floor
with 3" nails (Fig. C).
4
Nail 10' eave wall panel to 10' gable wall
stud with 1-1/2" nails spaced 6" apart.
5
Secure wall top plate with (1) 3" screw at the
corner at an angle as shown (Fig. D).
FINISH
Your 2nd 10' eave wall is now installed.
2nd 10' EAVE WALL INSTALLATION
x2
2" (5,1 cm)
x23
2" (5,1 cm)
(15,2 cm)
2" (5,1 cm)
Nails
x10
x1
1-1/2"
(3,8 cm)
3" (7,6 cm)
Nails
6"
Nail 2" nails first.
3" (7,6 cm)
Nails
Fig. C
2" (5,1 cm)
29
3" (7,6 cm)
3" (7,6 cm)
2" (5,1 cm)
Screw
Fig. A
Screw
3" (7,6 cm)
Screw
1-1/2" (3,8 cm)
Nails
Fig. B
Flush
Fig. D
6" (15,2 cm)