Download Print this page

Heartland VALUE Series Assembly Manual page 62

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
ZQL
x2
ZQR
x2
BEGIN
1
Install upper gable trim ZQR and ZQL flush to top of roof panels and flush at peak.
Secure trim with 2" finish nails evenly spaced, as shown.
Install lower gable trim ZJR and ZJL flush to top of roof panels and flush to installed trim.
2
Secure trim with 2" finish nails evenly spaced, as shown.
Repeat steps to install trim to the opposite gable.
ZQL
Flush
ZJL
FINISH
Your gable trim is now installed.
GABLE TRIM
5/8 x 4 x 48-5/16
ZJL
x2
(1,6 x 10 x 123 cm)
5/8 x 4 x 48-5/16
ZJR
x2
(1,6 x 10 x 123 cm)
Flush at peak
x88
5/8 x 4 x 36"
(1,6 x 10 x 91 cm)
5/8 x 4 x 36"
(1,6 x 10 x 91 cm)
Flush to
roof panel
60
2" (5,1 cm)
ZQR
2" (5,1 cm)
Finishing Nails
Flush
ZJR
Flush to
roof panel

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Classic 10 x 10