Download Print this page

Heartland VALUE Series Assembly Manual page 44

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x4
SP
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
x2
TJ
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
x2
TP
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
BEGIN
1
Orient parts on top of wall frames. Measure and mark from end of boards.
Secure from top with (2) 3" nails spaced every 24" (Fig. A).
2
3
Secure from bottom with (2) 3" screws at each corner (Fig. B).
3" (7,6 cm)
Nails
Fig. A
3" (7,6 cm)
FINISH
Your wall doublers are now installed.
CONTINUE TO NEXT PAGE TO CONTINUE
BUILDING YOUR SHED.
10' x 18' WALL DOUBLERS INSTALLATION
x2 JBD
2 x 4 x 20-3/8" (5,1 x 10,2 x 51,8 cm)
48"
(121,9 cm)
48"
(121,9 cm)
96"
Fig. B
(243,8 cm)
Screws
24"
(61 cm)
x80
x8
x2 RL
2 x 4 x 24" (5,1 x 10,2 x 61 cm)
92-5/8"
(235,3 cm)
TJ
SP
SP
Ensure all doubler seams are non-aligned
over seams of wall top plates.
TP
DOOR
RL
Nail TYP.
TJ
92-5/8"
(235,3 cm)
42
3" (7,6 cm)
3" (7,6 cm)
20-3/8"
(51,8 cm)
JBD
SP
TP
SP
RL
JBD
24"
(61 cm)
20-3/8"
(51,8 cm)
48"
(121,9 cm)
96"
(243,8 cm)
48"
(121,9 cm)
24"
(61 cm)

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Classic 10 x 10