Download Print this page

Heartland VALUE Series Assembly Manual page 37

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x32
2" (5,1 cm)
x13
1-1/2" (3,8 cm)
3
Nail lower edge of wall panels to floor frame
with 2" nails spaced 6" apart.
Angle nails into floor frame (Fig. C).
Secure wall bottom plates to floor
with 3" nails (Fig. C).
4
Nail 12' wall panel to 10' wall stud with
1-1/2" nails spaced 6" apart.
5
Secure gable wall top plate with (1) 3" screw
at the corner at an angle as shown (Fig. D).
FINISH
Your 2nd 14' wall is now installed.
2nd 14' EAVE WALL INSTALLATION
6"
(15,2 cm)
3" (7,6 cm)
Nails
2" (5,1 cm)
Nails
Nail 2" nails first.
Fig. C
x14
x1
3" (7,6 cm)
Nails
1-1/2" (3,8 cm)
35
3" (7,6 cm)
3" (7,6 cm)
3" (7,6 cm)
Screw
Fig. D
6" (15,2 cm)
Nails

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Classic 10 x 10