PARTS REQUIRED:
BEGIN
Install collar tie to the rafter with (3) 3" nails at each end
1
(Fig. A).
Starting at the wall with the door, install first
collar tie TM on the 2nd rafter from the gable
wall and then on every other rafter, as shown.
HINT:
For best appearance, install
collar ties on back side of rafter.
10' x 18'
FINISH
Your collar tie(s) are now installed.
COLLAR TIE INSTALLATION
TM
2 x 4 x 72" (5,1 x 10,2 x 182,9 cm)
10' x 10'
10' x 14'
6th
3" (7,6 cm)
3" (7,6 cm)
Nails
2nd
2nd
4th
2nd
4th
62
10x10' 10x14' 10x18'
x1
x3
x2
x6
x18
x12
Fig. A
Flush to roof