Figure 17: Chassis Partially Unpacked - Mellanox Technologies Vantage 8500 Installation Manual

288 port switch
Table of Contents

Advertisement

Rev A04
The upper packing foam covering the switch contains the following components:
Rail kit
Cabling guide brackets
Screw kit
Grounding kit
Console cable
Power cables
Getting Started Short Guide - Mellanox Solution
CD with documentation and software utilities fastened on top of the Vantage 8500 switch
chassis wrapped in an antistatic bag.
3. Remove all the accessories listed above and the packing foam on top of the chassis.
4. Lift the switch chassis from the pallet and place it on a flat surface.
Due to the weight of the chassis, it is recommended that a sufficient number people with the proper
equipment perform this operation.
CAUTION: Do NOT use the power supply handles for lifting, carrying, or moving the
unit.
This will damage the handles. When lifting the unit, take extra caution not to damage
power supply handles located at the bottom of the unit.
Use safe lifting procedures when moving the unit to avoid personal injury.
42
Mellanox Technologies

Figure 17: Chassis Partially Unpacked

Unpacking

Advertisement

Table of Contents
loading

Table of Contents