Moving Loads - Sav 531.42 Operating Instructions Manual

Battery-powered lifting magnets
Table of Contents

Advertisement

Available languages

Available languages

SAV 531.42
7 OPERATION
7.2.4

Moving loads

DANGER!
Notify everyone in the surrounding area that handling is about to start.
Lift the load to be handled by a few centimetres and check that the lifting procedure is correct (load remains in
horizontal position without being held).
Check the safety of the load attraction while the load is lifted:
– Apply pressure to the load, e.g. tap with a hammer.
– If multiple thin sheets are lifted, they must not peel off. If necessary, use the TIP-OFF function to set down the
excess load.
Accompany the load while holding it at the edge. Avoid collisions, swinging and sudden changes in direction
and speed.
Place the load only on a solid, stable surface.
Set down the load in a controlled and careful process.
Version 1.0
Hazard from falling load!
Risk of death from suspended loads!
Falling parts (e.g. from incorrect operation) can cause serious injuries and
even death.
Observe the safety instructions during the entire load handling process!
Do not step underneath suspended loads!
If the load tilts by more than 5°, immediately stop the lifting process and
set the load down again. Deactivate the lifting magnet, adjust the posi-
tion on the load and repeat the lifting process.
Do not leave suspended loads unattended!
[
97
]
EN

Advertisement

Chapters

Table of Contents
loading

Table of Contents