Commissioning; Acceptance And Unpacking - Sav 531.42 Operating Instructions Manual

Battery-powered lifting magnets
Table of Contents

Advertisement

Available languages

Available languages

SAV 531.42

6 COMMISSIONING

6.
COMMISSIONING
The safety information from section 2 "Safety" must be observed.
DANGER!
The battery-powered lifting magnet is delivered fully assembled. Operation is possible only after the tasks listed in
the following have been carried out by the personnel responsible for operation, installation and commissioning.
6.1

Acceptance and unpacking

Check that the packaging is not damaged.
Check the transport documents.
Check the accompanying documents, in particular that these refer to the delivered lifting magnet.
Check that the delivery is complete: The power supply cable and the remote control are located in the compart-
ment of the rear battery cover.
CAUTION!
Ensure that a suitable space with a level surface is available for unloading. The lifting capacity of the lifting
system must correspond to the parameters of the lifting magnet.
After removing the packaging material (usually a type of foam), attach the lifting magnet directly at the lifting
eye.
After removing the lifting magnet from the box, place it on a clean, solid, horizontal surface.
Hazard from incorrect commissioning!
Incorrect implementation of the tasks listed in the following can generate
hazards for personal safety during installation and operation of the lifting
magnet.
Ensure to carry out the following tasks correctly!
Damage!
Inform the delivery company about any damage or other defects immediate-
ly. If there are any contradictions between the transport documents and your
order, please notify SAV GmbH.
[
86
]
Version 1.0

Advertisement

Chapters

Table of Contents
loading

Table of Contents