Environmental requirements:

Unpacking the SCOPIA Elite 5200 Series

We strongly recommend that you follow safety guidelines described in this section during MCU
unpacking.
Procedure
Step 1
Inspect the shipping box to verify that it is not seriously damaged during shipping.
Step 2
Place the shipping box on a horizontal surface paying attention to the This Side Up symbol on the
shipping box.
Note:
Note:
RADVISION | Installation Guide for SCOPIA Elite 5200 Series MCU Version 7.5
Chassis size (W×H×D): 448mm×133.35mm×400mm (17.6"×5.25"× 15.75")
Rack mount size: U×482.6 mm (19")
Weight:
Empty chassis (the chassis, the Controller blade and the AC power supply): ~13kg (~29Lbs)
Fully loaded chassis (the chassis, the Controller blade, two Media blades and the AC power
supply): ~25.5kg (~56.2Lbs)
Operating Temperature: 0 C° to 45 C° (32 F to 113 F)
Humidity: 5% to 90% non-condensing
Storage and transit temperature: -25 C° to 70 C° (-13 F to 158 F), ambient
Acoustics 56dBA-77dBA (77dBA standard operation)
The accessories kit is situated on top of the MCU unit inside the shipping box and can be
damaged if the box is placed upside down. Pay attention to the This Side Up symbol on
the shipping box to handle the box correctly at all times.
To prevent injury and equipment damage, follow lifting guidelines described in the Safety
Guide when lifting or moving the shipping box.
Figure 2-1
This Side Up Symbol
How to Prepare for SCOPIA Elite 5200 Series MCU Installation | 5