Download Print this page

APRILIA RSV4 1100 Factory 2021 Manual page 314

Advertisement

Engine
The five ring gaps (two piston rings, two oil scraper
rings, one oil scraper spring) are fitted displaced
90º to each other, starting from the exhaust-side
stud bolt opposite the chain and continuing clock-
wise.
The fitted pistons have two selections A and B.
Therefore they are coupled with the cylinder ac-
cording to the selection of the latter, which is
marked on the upper crankcase halves.
Pre-assemble the pistons on the workbench with
the connecting rod shank and the relative semi-
bushing.
The pre-assembly procedure is identical for all four
pistons and must be done as follows:
with the piston crown parallel to the
workbench and the arrow (1) posi-
tioned from the side opposite of the
operator, fit the connecting rod shank
with the bevelling (2), on the hole of the
rod head, on the right side.
Position the special tool on the crank-
case.
Partially insert the connecting rod
shank - piston assembly in the corre-
sponding cylinder with the arrow (on
the piston) twisted 45°towards the ex-
haust.
When the connecting rod head is low,
and has exceed its lubricating jet, ro-
tate the connecting rod shank - piston
assembly with the arrow on the piston
crown towards the exhaust; the bevel-
ENG - 314
RSV4 1100 Factory

Advertisement

loading