2N IP Force 9151101W Installation Manual page 43

Table of Contents

Advertisement

Wall mounting may be a problem where vandals may destroy the unit (in public garages, e.g.).
Therefore, use steel fixing elements instead of the dowels and screws included in the delivery.
Be sure to insert plugs into unused bushing holes to avoid water leakage during facade cleaning,
for example. Never leave the holes open for even a short time (one day delay between mounting
and cable connection, e.g.).
Warning
Eliminate the risk of accident! Wall mounting is not suitable for narrow passages or places where
people's attention may be distracted. The manufacturer shall not be liable for injuries incurred as a
result of unsafe mounting!
1.
Select position with respect to the supply cables.
Where the cables are installed inside a structure or
wall, use the hole at the intercom bottom.
2.
Drill holes of the depth of 70 mm for dowels in the wall
as shown in the figure. Push or hammer the enclosed
dowels into the drilled holes. Use some suitable
building adhesive if the dowels are too loose. Use fixing
elements of your own for steel structure surface
mounting (metric screws + nuts, e.g.).
3.
Remove the front panel from the intercom.
4.
Select the holes for cable supply. Select and mount the
bushings depending on the cables: 2-hole bushing or 1-
hole bushing or both. Insert the blanks in the other
holes.
5.
Put the intercom on the wall/structure while
introducing cables inside. Leave some of the cables
inside the unit as a reserve. Insert the plugs in the
unused bushings and tighten the bushing nuts
carefully.
6.
Do not complete mounting until you have finished
electrical installation. Where cables lead along the
surface, use the bushings included in the delivery.
Stand Mounting
This mounting method is suitable for entrance installations in particular.
What you need for installation:
Installation manual 2N® IP Force
 
43 /  118

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents