Deutschmann Automation GmbH & Co. KG
17.6 Setting the CANopen
®
Set the CANopen
-Node-ID and the baud rate at the fieldbus end of the module on the DIP-
switch (see also chapter 27.4.3).
Attention:
The CANopen
All users in the CANopen
These values are read in only on power-up of the gateway!
®
17.6.1 CANopen
Connect the device to the CANopen
17.6.2 Connection to the process device
Please also read the manual for the process device when commissioning the process device.
17.6.3 Connecting the supply voltage
Please connect 10..33 DC voltage to the terminals provided for this.
17.6.4 Shield connection
Earth the top-hat rail onto which the module has been snapped.
17.6.5 Project planning
Use any project planning tool for project planning.
If the required EDS file was not supplied with your project planning tool, a sample file can be
found on the Internet (www.deutschmann.de).
17.7 Setting the DeviceNet™ address and baud rate
Set the DeviceNet-Node-ID and the baud rate at the fieldbus end of the module on the DIP-
switch (see chapter 28.3.3).
Attention:
The DeviceNet address set must correspond to the planned address!
All users in the DeviceNet have to use the same Baud rate!
These values are read in only on power-up of the gateway!
17.8 DeviceNet™ connection
Connect the device to the DeviceNet at the interface labelled "DeviceNet".
17.9 Connection to the process device
Please also read the manual for the process device when commissioning the process device.
17.10 Connecting the supply voltage
Please connect 10..33 DC voltage to the terminals provided for this.
25.9.20
Fieldbus-Gateway UNIGATE
®
address and baud rate
®
address set must correspond to the planned address!
®
connection
®
at the interface labelled "CANopen
®
CX C4Map - DeviceNet V. 1.0
have to use the same Baud rate!
Commissioning guide
®
".
47
Need help?
Do you have a question about the UNIGATE CX-CANopen - DeviceNet and is the answer not in the manual?