Section 5
the connector pin using a torque wrench
with a set torque of 680-800 Nm. The in-
spection should be carried out cyclically:
the first inspection after traveling 50 km
with a load or after 500 working hours,
the next inspection after 5000 km or after
1500 working hours, then once a year.
INSPECT RUBBER BUSHINGS
Check the wear of the rubber bushings
(10) of the rocker arms, as well as the rigid
and adjustable control rods.
The inspection should be carried out cycli-
cally: the first inspection after traveling 50
km with a load or after 500 working hours,
the next inspection after 5000 km or after
1500 working hours, then once a year.
5.24
PRONAR T700M/1
Technical inspection schedule
The washers (8) should not be in contact
with the bracket (9). If they are touching,
replace the conical rubber bushings (10).
Before installation, grease the rubber
bushings.
INSPECT THE LOCKING OF THE NUTS
The inspection consists of a visual check of
the completeness and condition of the cotter
pins (11) securing the rocker arm pin nuts.
Perform the inspection once a year.
INSPECT THE ABSORBER SPRINGS
Once a year, check the condition of the
springs (1) thoroughly clean and brush the
sides of the springs to check for cracks.
.
I.3.11.623.18.1.EN