Assembly And Set Up; Connecting The Foot Pedal; Squaring Arm - Baileigh Industrial SH-120250-HD Operator's Manual

Hydraulic shear
Table of Contents

Advertisement

ASSEMBLY AND SET UP

WARNING:
power source until the machine is completely assembled and you read and
understand the entire instruction manual.

Connecting the Foot Pedal

1. Unpack the foot pedal and route the plug connector to the bottom of the electrical enclosure.
2. Connect and secure the plug into the socket.
3. Position the foot pedal as needed for ease of operation. DO NOT allow the harness to
become a trip hazard.

Squaring Arm

1. Remove the squaring arm mounting bolts (A).
2. Unpack the squaring arm and clean the rust
inhibitor off of the squaring arm and the mounting
pads.
3. Place the squaring arm over the eccentric post (B).
4. Install the mounting bolts (A) so that they are
lightly tightened but that the arm may be adjusted
to square.
5. Using a framing square aligned to the squaring
arm and the shear blade cutting edge, adjust the
eccentric posts (B) until square.
6. Tighten the mounting bolts (A).
For your own safety, DO NOT connect the machine to the
16
16
A
B

Advertisement

Table of Contents
loading

Table of Contents