3.4.
Material insertion
Never walk under a suspended load!
Never climb onto the-roller conveyor!
Do not hold the material for clamping in the vice! The vice can cause injuries!
3.4.1.
Selecting means of manipulation
Use the sufficient means to lift and transfer the material!
Handle the material only with a lift truck or use suspension strands and a
crane!
Do not use the lift truck or crane in case that you do not have the license to
operate it!
3.4.2.
Insertion
Insert material into the vice and ensure that the material cannot move in the vice or
fall from the vice after the clamping. If you are cutting long pieces (for example
rods, tubes), you must use a roller conveyor for shifting the material to the
band saw. Contact Bomar for more information about roller conveyors.
Make sure the conveyor is long enough and the material cannot drop off the
conveyor.
Make sure round pieces always stay on two vertical rollers and cannot fall off the
conveyor!
3.4.3.
Bundle material cutting
If you want to cut the material in bundles, it is suggested to load the material in the
following way.
Round material bundle: For round material take care that the bars are put
according to the picture. If the bars are put differently, they might slide during
handling.
It is recommended to always weld the material at the rear end of the bundle to
secure it from moving. Before welding always, switch the machine off with the main
switch! The magnetic fields, which occur during welding, may damage the controls!
59