Electrical Performance Specifications
2 Electrical Performance Specifications
Table 2-1
lists the electrical performance specifications in room temperature (20 to 25°C). Characteristics are
given for an input voltage of V
Table 2-1. TPSM8D6C24EVM-2V0 Electrical Performance Specifications
Parameter
Input Characteristics
Input voltage range, V
IN
Full load input current
No load input current
Enable switching threshold
Disable switching threshold
Output Characteristics
VOUT_A output voltage, V
OUTA
VOUT_B output voltage, V
OUTB
VOUT_A output load current, I
OUTA
VOUT_B output load current, I
OUTB
VOUT_A output voltage regulation
VOUT_B output voltage regulation
VOUT_A output overcurrent fault
threshold
VOUT_B output overcurrent fault
threshold
Systems Characteristics
Switching frequency
Operating case temperature
4
TPSM8D6C24EVM-2V0 User's Guide
= 12 V, unless otherwise specified.
IN
Test Conditions
I
= I
= 35 A
OUTA
OUTB
V
= 5 V, I
= I
= 35 A
IN
OUTA
OUTB
I
= I
= 0 A, switching enabled
OUTA
OUTB
Set by default resistor divider, JP3 and JP4 in UVLO
position
Set by default resistor divider, JP3 and JP4 in UVLO
position
Line Regulation: V
= 5V to 16V
IN
Load Regulation: I
= 0 A to 35 A
OUTA
Line Regulation: V
= 5V to 16V
IN
Load Regulation: I
= 0 A to 35 A
OUTB
Programmed by MSEL2
Programmed by MSEL2
Programmed by MSEL1
I
= I
= 35 A, Airflow = 200 LFM, 10 minute soak
OUTA
OUTB
Copyright © 2021 Texas Instruments Incorporated
www.ti.com
MIN
TYP
MAX
Unit
5
12
16
V
7
A
16.8
A
136
mA
3.92
V
3.50
V
0.8
V
1.2
V
0
35
A
0
35
A
0.1
%
0.1
%
0.1
%
0.1
%
52
A
52
A
550
kHz
100
°C