10 Using the Fusion GUI

10.1 Opening the Fusion GUI

The Fusion GUI should include IC_DEVICE_ID in the scanning mode to find TPSM8D6C24. The EVM needs
power to be recognized by the Fusion GUI. See
SLUUCK6 – DECEMBER 2021
Submit Document Feedback
Section 5
for the recommended procedure.

Figure 10-1. Select Device Scanning Mode