7 Performance Data and Typical Characteristic Curves

Figure 7-1
through
Figure 7-19
voltage is 12 V and the oscilloscope measurements use 20-MHz bandwidth limiting, unless otherwise noted.

7.1 Efficiency

100
90
80
70
60
50
40
30
20
10
0
0
5
10
Output Current (A)

Figure 7-1. VOUT_A Efficiency

7.2 Load Regulation

0.805
0.8045
0.804
0.8035
0.803
0.8025
0.802
0.8015
0.801
0.8005
0.8
0
5
10

Figure 7-3. VOUT_A Load Regulation

7.3 Line Regulation

0.805
0.8045
0.804
0.8035
0.803
0.8025
0.802
0.8015
0.801
0.8005
0.8
5
6
7
8

Figure 7-5. VOUT_A Line Regulation

SLUUCK6 – DECEMBER 2021
Submit Document Feedback
present typical performance curves for the TPSM8D6C24EVM-2V0. The input
PVIN = 5 V
PVIN = 12 V
PVIN = 16 V
15
20
25
30
35
PVIN = 5 V
PVIN = 12 V
PVIN = 16 V
15
20
25
30
35
Output Current (A)
I
= 0 A
OUT
I
= 15 A
OUT
I
= 25 A
OUT
I
= 35 A
OUT
9
10
11
12
13
14
15
16
Input Voltage (V)
Copyright © 2021 Texas Instruments Incorporated
Performance Data and Typical Characteristic Curves
100
90
80
70
60
50
40
30
20
10
0
0
5
10
15
20
Load Current (A)

Figure 7-2. VOUT_B Efficiency

1.2035
1.203
1.2025
1.202
1.2015
1.201
1.2005
1.2
0
5
10
15
20
Output Current (A)

Figure 7-4. VOUT_B Load Regulation

1.2035
1.203
1.2025
1.202
1.2015
1.201
1.2005
1.2
5
6
7
8
9
10
11
Input Voltage (V)

Figure 7-6. VOUT_B Line Regulation

TPSM8D6C24EVM-2V0 User's Guide
PVIN = 5V
PVIN = 12V
PVIN = 16V
25
30
35
PVIN = 5 V
PVIN = 12 V
PVIN = 16 V
25
30
35
I
= 0 A
OUT
I
= 15 A
OUT
I
= 25 A
OUT
I
= 35 A
OUT
12
13
14
15
16
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPSM8D6C24EVM-2V0 and is the answer not in the manual?

Table of Contents