Texas Instruments TPSM33625EVM User Manual
Texas Instruments TPSM33625EVM User Manual

Texas Instruments TPSM33625EVM User Manual

Evaluation module

Advertisement

Quick Links

www.ti.com
User's Guide
TPSM33625, TPSM3365F Evaluation Module
The TPSM33625EVM and TPSM33625FEVM enables the evaluation of the TPSM33625 and TPSM33625F
power modules. The EVMs allow for several configurations of the power module. Additionally, electrical test
points provide ease in verifying the performance of the power regulator. Lastly, these EVMs serve as a basis for
the TPSM33625 and TPSM33625F layout and component selection.
1
Introduction.............................................................................................................................................................................3
2 Setup Procedure.....................................................................................................................................................................
Setup................................................................................................................................................................................5
4
Schematic................................................................................................................................................................................7
5 TPSM33625EVM and TPSM33625FEVM Evaluation............................................................................................................
6 Layout....................................................................................................................................................................................
7 Bill of Materials.....................................................................................................................................................................
Documentation........................................................................................................................................................18
9 Revision History...................................................................................................................................................................
Diagram...................................................................................................................................................6
Figure 4-1. Schematic-Compliance Testing Filter........................................................................................................................
Figure 4-2. Schematic (TPSM33625EVM) - TPSM33625..........................................................................................................
Figure 4-3. Schematic (TPSM33625FEVM) - TPSM33625F......................................................................................................
Measurement......................................................................................................................................10
Measurement......................................................................................................................................10
Figure 5-5. IR Top Case Measurement......................................................................................................................................
Figure 5-6. IR Top Case Measurement......................................................................................................................................
SLVUCG3A - SEPTEMBER 2022 - REVISED MARCH 2023
Submit Document Feedback
ABSTRACT
CAUTION
!
Read the user's guide before use.
CAUTION
Hot surface! Contact can cause burns. Do not touch!

Table of Contents

List of Figures
Scan........................................................................................................................................9
Scan........................................................................................................................................9
Copyright © 2023 Texas Instruments Incorporated
Table of Contents
Points...............................................8
Points.............................................8
TPSM33625, TPSM3365F Evaluation Module
4
9
13
17
19
7
7
7
11
11
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPSM33625EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPSM33625EVM

  • Page 1: Table Of Contents

    TPSM33625, TPSM3365F Evaluation Module ABSTRACT The TPSM33625EVM and TPSM33625FEVM enables the evaluation of the TPSM33625 and TPSM33625F power modules. The EVMs allow for several configurations of the power module. Additionally, electrical test points provide ease in verifying the performance of the power regulator. Lastly, these EVMs serve as a basis for the TPSM33625 and TPSM33625F layout and component selection.
  • Page 2 Trademarks www.ti.com Figure 5-7. IR Top Case Measurement............................12 Figure 5-8. IR Top Case Measurement............................12 Figure 6-1. PCB Top 2-D (TPSM33625EVM)..........................Figure 6-2. PCB Top 2-D (TPSM33625FEVM).......................... Figure 6-3. PCB Bottom 2-D..............................14 Figure 6-4. Top Layer.................................14 Figure 6-5. Mid Layer 1................................15 Figure 6-6.
  • Page 3: Introduction

    TPSM33625FRDNR, the fixed 1-MHz version of the TPSM33625 with mode selection and synchronization pin. The TPSM33625EVM is configured by default to be enabled with an output voltage of 5 V, and a switching frequency of 2.2 MHz with frequency foldback (auto mode) at light load. The TPSM33625FEVM is configured by default to be enabled with an output voltage of 5 V, and configured for auto mode.
  • Page 4: Setup Procedure

    Setup Procedure www.ti.com 2 Setup Procedure The following procedure outlines the steps to be taken for using the TPSM33625EVM and TPSM625FEVM. Use this section in conjunction with Section 3 to correctly setup the EVM. 1. Determine the output voltage that is to be evaluated, then reference Section 2.
  • Page 5: Test Setup

    Test points for applying an AC signal source (across an injection resistor) often used in evaluating the loop TP9, TP10 response in a current mode regulator, such as the TPSM33625 or TPSM33625F. SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023 TPSM33625, TPSM3365F Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 6: Figure 3-1. Test Setup Diagram

    Test Setup www.ti.com E-Load DC Supply Ammeter Ammeter Figure 3-1. Test Setup Diagram TPSM33625, TPSM3365F Evaluation Module SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 7: Schematic

    Section Figure 4-1. Schematic-Compliance Testing Filter In the buck schematic, the difference between the TPSM33625EVM and TPSM33625FFEVM is the REFDES=U1 device part number. Use a buck schematic with additional feedback resistors to program the output voltage and add a placeholder for additional output capacitance to achieve stability or meet a output transient specification with pin definition RT (adjustable frequency) or Mode/Sync (mode select or synchronization) differing.
  • Page 8: Figure 4-4. Schematic (Tpsm33625Evm) - Configuration Jumpers And Evaluation Test

    Schematic www.ti.com Figure 4-4. Schematic (TPSM33625EVM) – Configuration Jumpers and Evaluation Test Points A disable, mode select or synchronization, and output voltage select jumper are provided to aid the evaluation. Additionally, test points to evaluate product features and stability are provided.
  • Page 9: Tpsm33625Evm And Tpsm33625Fevm Evaluation

    TPSM33625EVM and TPSM33625FEVM Evaluation 5 TPSM33625EVM and TPSM33625FEVM Evaluation The data was tested on unmodified EVM, configured for 1-MHz operation and 5 V , and was measured at 12 V and a 2-A load. Figure 5-1. CISPR32 Conducted Scan...
  • Page 10: Figure 5-3. Ir Top Case Measurement

    Figure 5-3. IR Top Case Measurement 12 V , 1 MHz, 2-A load (continuous) Figure 5-4. IR Top Case Measurement TPSM33625, TPSM3365F Evaluation Module SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 11: Figure 5-5. Ir Top Case Measurement

    Figure 5-5. IR Top Case Measurement 24 V , 2.2 MHz, 2-A load (continuous) Figure 5-6. IR Top Case Measurement SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023 TPSM33625, TPSM3365F Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 12: Figure 5-7. Ir Top Case Measurement

    Figure 5-7. IR Top Case Measurement 24 V , 500 kHz, 2-A load (continuous) Figure 5-8. IR Top Case Measurement TPSM33625, TPSM3365F Evaluation Module SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 13: Layout

    Layout 6 Layout The top silkscreen (that is, J4) differs between the TPSM33625EVM and TPSM3365FEVM, which is the only difference between the layer plots (no routing). Figure 6-1. PCB Top 2-D (TPSM33625EVM) Figure 6-2. PCB Top 2-D (TPSM33625FEVM) SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023...
  • Page 14: Figure 6-3. Pcb Bottom 2-D

    Layout www.ti.com Figure 6-3. PCB Bottom 2-D Figure 6-4. Top Layer TPSM33625, TPSM3365F Evaluation Module SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 15: Figure 6-5. Mid Layer 1

    Reserved for solid ground plane for low-noise and optimized thermal design. Figure 6-5. Mid Layer 1 Primary routing layer Figure 6-6. Mid Layer 2 SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023 TPSM33625, TPSM3365F Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 16: Figure 6-7. Bottom Layer

    PCB as the input capacitor provides a slightly lower input loop inductance. A single layer implementation is satisfactory as well. Figure 6-7. Bottom Layer TPSM33625, TPSM3365F Evaluation Module SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 17: Bill Of Materials

    Q200 Grade 0, 0402 RES, 20.0 k, 1%, 0.063 W, AEC- 20.0 k 0402 CRCW040220K0FKED Vishay-Dale Q200 Grade 0, 0402 SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023 TPSM33625, TPSM3365F Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 18: Related Documentation

    2.5-A DC-DC Power Module FCMOD11 TPSM33625FRDNR) 8 Related Documentation Texas Instruments, Input Filter Design for Switching Power Supplies application report. TPSM33625, TPSM3365F Evaluation Module SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 19: Revision History

    NOTE: Page numbers for previous revisions may differ from page numbers in the current version. Changes from Revision * (September 2022) to Revision A (March 2023) Page • Deleted text in Schematic section........................7 SLVUCG3A – SEPTEMBER 2022 – REVISED MARCH 2023 TPSM33625, TPSM3365F Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 20 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 21 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 22 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 23 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 24 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 25 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...

This manual is also suitable for:

Tpsm33625fevm

Table of Contents