EVM Assembly Drawing and PCB Layout
8 EVM Assembly Drawing and PCB Layout
Figure 8-1
through
Figure 8-8
Figure 8-1. TPSM8D6C24EVM-2V0 Top Side
Component View (Top View)
Figure 8-3. TPSM8D6C24EVM-2V0 Top Copper (Top
16
TPSM8D6C24EVM-2V0 User's Guide
show the design of the TPSM8D6C24EVM-2V0 printed circuit board.
View)
Copyright © 2021 Texas Instruments Incorporated
Figure 8-2. TPSM8D6C24EVM-2V0 Bottom Side
Component View (Bottom View)
Figure 8-4. TPSM8D6C24EVM-2V0 Internal Layer 1
(Top View)
www.ti.com
SLUUCK6 – DECEMBER 2021
Submit Document Feedback
Need help?
Do you have a question about the TPSM8D6C24EVM-2V0 and is the answer not in the manual?