10.9 Pin Strapping

Use the Pin Strapping tab
some of the PMBus commands at power up. The EEPROM Value column shows the values currently configured
to the related PMBus commands.
SLUUCK6 – DECEMBER 2021
Submit Document Feedback
(Figure
10-8) to aid in selection of external pin strapping resistors used to program
Figure 10-9. Configure – Pin Strapping