Test Setup
Shunt Position
Selection
CNTL_INPUT
PMBus adapter control signal
UVLO
Resistor divider to PVIN
DISABLE
EN/UVLO short to ground
Table 4-4
lists the options for the AVIN pin selections on JP1 and JP2.
Shunt Position
Selection
AVIN
AVIN pin connected to AVIN input through 10-Ω resistor. Use this selection when testing with a split rail input.
PVIN
AVIN pin connected to PVIN through 10-Ω resistor
Table 4-5
lists the EVM connector functions.
Connector
J1
J2
T1
T2, T3
T4
T5
T6, T8
4.4 Evaluating Split Rail Input
The default configuration of the EVM is for single rail input. Split rail input enables operation with 3.3-V PVIN. For
split rail operation, configure the jumpers on the EVM as follows:
1. Move the jumper JP1 and JP2 to AVIN position to disconnect the AVIN pin from the PVIN pins.
2. Apply the AVIN input to T4. 4-V or greater AVIN is required to bring the VDD5 voltage high enough to enable
conversion.
3. If operation with 3.3-V PVIN is needed and the CNTL jumpers (JP3 and JP4) are in UVLO position,
the resistor divider at the EN/UVLO will need to be changed. Alternately, move the CNTL jumpers to
CNTL_INPUT position and use the control signal to enable conversion or use the ON_OFF_CONFIG and
OPERATION commands to enable conversion.
8
TPSM8D6C24EVM-2V0 User's Guide
Table 4-3. JP3 and JP4 Selections
Table 4-4. JP1 and J2 Selections
Table 4-5. Connector Functions
Name
Description
Micro-USB Power
Micro USB connector to power EVM from a 5-V USB source
PMBus
PMBus socket for TI FUSION adapter
PVIN
VIN+ connector
PGND
VIN– connector
AVIN
External AVIN connector
VOUT_A
VOUT+ connector
PGND
VOUT– connector
Copyright © 2021 Texas Instruments Incorporated
www.ti.com
SLUUCK6 – DECEMBER 2021
Submit Document Feedback
Need help?
Do you have a question about the TPSM8D6C24EVM-2V0 and is the answer not in the manual?