Advertisement

Quick Links

This user's guide describes the characteristics, operation, and use of TI's TPSM82810 evaluation module
(EVM). The TPSM82810EVM-089 is designed to help you easily evaluate and test the operation and
functionality of the TPSM82810 buck converter power module. The EVM converts a 2.75-V to 6.0-V input
voltage to a regulated 1.8-V output voltage that delivers up to 4 A. This user's guide includes setup
instructions for the hardware, a printed-circuit board (PCB) layout, a schematic diagram, and a bill of
materials (BOM).
SLUUC44 – July 2019
Submit Documentation Feedback
TPSM82810EVM Evaluation Module
Copyright © 2019, Texas Instruments Incorporated
User's Guide
SLUUC44 – July 2019
TPSM82810EVM Evaluation Module
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPSM82810EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPSM82810EVM

  • Page 1 This user’s guide describes the characteristics, operation, and use of TI's TPSM82810 evaluation module (EVM). The TPSM82810EVM-089 is designed to help you easily evaluate and test the operation and functionality of the TPSM82810 buck converter power module. The EVM converts a 2.75-V to 6.0-V input voltage to a regulated 1.8-V output voltage that delivers up to 4 A.
  • Page 2: Performance Specification

    The power module is available in a 3.0-mm × 4.0-mm x 2.4-mm, uSilL package. Performance Specification Table 1 provides a summary of the TPSM82810EVM-089 performance specifications. Table 1. Performance Specification Summary SPECIFICATION TEST CONDITIONS...
  • Page 3: Connector Descriptions

    J1, between VIN and GND, and connect the load to J2 between VOUT and GND. TPSM82810EVM-089 Test Results The TPSM82810EVM-089 was used to take the typical characteristics data in the TPSM82810 Low Input Voltage, Fixed Frequency Step-down Converter Module Data Sheet.
  • Page 4: Board Layout

    Board Layout www.ti.com Board Layout This section provides the TPSM82810EVM-089 board layout. The Gerber files are available on the TPSM82810EVM-089 tool page. Figure 1. Top Silk Figure 2. Top Layer Figure 3. Layer 1 Figure 4. Layer 2 TPSM82810EVM Evaluation Module SLUUC44 –...
  • Page 5 Board Layout www.ti.com Figure 5. Bottom Layer SLUUC44 – July 2019 TPSM82810EVM Evaluation Module Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 6 47uF 470pF COMP/FSET COMP/FSET SS/TR SS/TR 100k TPSM82810SIL 0.01uF 0.01uF BoardGND BoardGND VOUT 100k MODE COMP/FSET SS/TR SS/TR 8.06k 4700pF Figure 6. TPSM82810EVM-089 Schematic TPSM82810EVM Evaluation Module SLUUC44 – July 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 7: Bill Of Materials

    100 kΩ Resistor 1%, 0.1 W 0603 8.06 kΩ Resistor 1%, 0.1 W 0402 Low-Input Voltage, Adjustable-Frequency Step-down SIL0014 TPSM82810SIL Texas Converter Power Module Instruments SLUUC44 – July 2019 TPSM82810EVM Evaluation Module Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 8 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 9 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 10 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 11 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 12 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 13 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...

This manual is also suitable for:

Tpsm82810evm-089]

Table of Contents