Transient Response; Control Loop Bode Plot; Figure 7-7. Vout_A Transient Response; Figure 7-8. Vout_B Transient Response - Texas Instruments TPSM8D6C24EVM-2V0 User Manual

Table of Contents

Advertisement

Performance Data and Typical Characteristic Curves

7.4 Transient Response

Figure 7-7
and
Figure 7-8

Figure 7-7. VOUT_A Transient Response

7.5 Control Loop Bode Plot

Figure 7-9. VOUT_A Bode Plot, 35-A Load

12
TPSM8D6C24EVM-2V0 User's Guide
show the transient response waveform with a 10-A to 20-A transient at 1 A/µs.
Copyright © 2021 Texas Instruments Incorporated

Figure 7-8. VOUT_B Transient Response

Figure 7-10. VOUT_B Bode Plot, 35-A Load

www.ti.com
SLUUCK6 – DECEMBER 2021
Submit Document Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPSM8D6C24EVM-2V0 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents