Electrical Performance Specifications

Table 1. TPS40322EVM-679 Electrical Performance Specifications
PARAMETER
Input Characteristics
VIN
Voltage range
Maximum input current
No-load input current
Output 1 Characteristics
VOUT1
Output voltage
I
Output load current
OUT1
Output voltage regulation
Output voltage ripple
Output over current
Output 2 Characteristics
VOUT2
Output voltage
I
Output load current
OUT2
Output voltage regulation
Output voltage ripple
Output over current
Systems Characteristics
Switching frequency
Peak efficiency
Full load efficiency
Operating temperature
SLUU506 – June 2011
Submit Documentation Feedback
TEST CONDITIONS
VIN = VIN
, I
= I
= 10 A
(min)
OUT1
OUT2
I
≤ I
≤ I
OUT1(min)
OUT1
OUT1(max)
VOUT1
≤ VOUT1 ≤ VOUT1
(min)
Line Regulation: VOUT1
≤ VOUT1 ≤
(min)
VOUT1
(max)
Load Regulation: I
≤ I
OUT1(min)
OUT1
I
= I
OUT1
OUT1(max)
VOUT1
≤ VOUT1 ≤ VOUT1
(min)
I
≤ I
≤ I
OUT2(min)
OUT2
OUT2(max)
VOUT2
≤ VOUT2 ≤ VOUT2
(min)
Line Regulation: VOUT2
≤ VOUT2 ≤
(min)
VOUT2
(max)
Load Regulation: I
≤ I
OUT2(min)
OUT2
I
= I
OUT2
OUT2(max)
VOUT2
≤ VOUT2 ≤ VOUT2
(min)
VOUT1 = 1.2 V, 3.5 A ≤ I
OUT1
VOUT2 = 1.8 V, 2.5 A ≤ I
OUT2
VOUT1 = 1.2 V, I
= I
OUT1
OUT1(max)
VOUT2 = 1.8 V, I
= I
OUT2
OUT2(max)
Copyright © 2011, Texas Instruments Incorporated
Electrical Performance Specifications
MIN
8.0
0
(max)
≤ I
OUT1(max)
(max)
0
(max)
≤ I
OUT2(max)
(max)
≤ 5.5 A, VIN = 8 V
≤ 6.5 A, VIN = 8 V
, VIN = 12 V
, VIN = 12 V
Dual Output Synchronous Buck Converter
TYP
MAX
UNITS
12.0
15.0
V
4.5
A
55
mA
1.2
V
10
A
0.5%
0.5%
24
mV
PP
14.6
A
1.8
V
10
A
0.5%
0.5%
36
mV
PP
14.6
A
500
kHz
89%
90%
86%
87%
25
ºC
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS40322EVM-679 and is the answer not in the manual?

Table of Contents