Description; Before You Begin; Features - Texas Instruments TPSM8D6C24EVM-2V0 User Manual

Table of Contents

Advertisement

www.ti.com

1 Description

The TPSM8D6C24 is a configurable dual-output buck converter module. The TPSM8D6C24EVM-2V0 uses a
nominal 12-V bus to produce a regulated 0.8-V and 1.2-V output at up to 35 A of load current each. The
TPSM8D6C24EVM-2V0 demonstrates the dual output capability.

1.1 Before You Begin

The following warnings and cautions are noted for the safety of anyone using or working close to the
TPSM8D6C24EVM-2V0. Observe all safety precautions.
!
The circuit module has signal traces, components, and component leads on the bottom of the board.
This may result in exposed voltages, hot surfaces, or sharp edges. Do not reach under the board
during operation.
The circuit module may be damaged by over temperature. To avoid damage, monitor the
temperature during evaluation and provide cooling, as needed, for the system environment.
Some power supplies can be damaged by application of external voltages. If using more than
one power supply, check the equipment requirements and use blocking diodes or other isolation
techniques, as needed, to prevent damage to the equipment.
The communication interface is not isolated on the EVM. Be sure no ground potential exists between
the computer and the EVM. Also be aware that the computer is referenced to the battery-potential of
the EVM.

1.2 Features

Regulated 0.8-V and 1.2-V output up to 35-A
Convenient test points for probing critical waveforms
PMBus
®
connector for easy connection with the TI USB adapter
SLUUCK6 – DECEMBER 2021
Submit Document Feedback
The TPSM8D6C24EVM-2V0 circuit module may become hot during operation due
Warning
to dissipation of heat. Avoid contact with the board. Follow all applicable safety
procedures applicable to your laboratory.
Caution
Do not leave the EVM powered when unattended.
WARNING
CAUTION
CAUTION
CAUTION
output current each
DC
Copyright © 2021 Texas Instruments Incorporated
Description
TPSM8D6C24EVM-2V0 User's Guide
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPSM8D6C24EVM-2V0 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents