7.6 Output Ripple

Figure 7-11
and
Figure 7-14

Figure 7-11. VOUT_A Output Ripple, No Load

Figure 7-13. VOUT_A Output Ripple, 35-A Load

SLUUCK6 – DECEMBER 2021
Submit Document Feedback
show the output ripple waveforms at 0-A and 35-A load.
Copyright © 2021 Texas Instruments Incorporated
Performance Data and Typical Characteristic Curves

Figure 7-12. VOUT_B Output Ripple, No Load

Figure 7-14. VOUT_B Output Ripple, 35-A Load