Texas Instruments TPSM8D6C24EVM-2V0 User Manual page 21

Table of Contents

Advertisement

www.ti.com
Designator
Quantity
Value
Description
R42
1
1.00 k
RES, 1.00 k, 1%, 0.1 W,
AEC-Q200 Grade 0, 0603
SH-JP1, SH-
4
1 × 2
Shunt, 100 mil, Gold
JP2, SH-JP3,
plated, Black
SH-JP4
SMB1, SMB2 2
Connector, Receptacle, 50
Ω, TH
T1, T2, T3,
7
Therminal Block, 5 mm, 2-
T5, T6, T7, T8
pole, Tin, TH
T4
1
Terminal Block, 3.5-mm
Pitch, 2 × 1, TH
TP1, TP6,
3
Test Point, Multipurpose,
TP18
Red, TH
TP2, TP3,
7
Test Point, Multipurpose,
TP4, TP10,
Black, TH
TP16, TP22,
TP27
TP5, TP7,
17
Test Point, Multipurpose,
TP8, TP9,
White, TH
TP11, TP12,
TP13, TP14,
TP15, TP17,
TP19, TP20,
TP21, TP23,
TP24, TP25,
TP26
U1
1
TPSM8D6x24MOW59
C17, C18,
0
47 μF
CAP, CERM, 47 μF, 10 V,
C19, C22,
±10%, X7R, 1210
C31, C32,
C33, C36,
C53, C54,
C55, C58,
C63, C66,
C67, C68
C44, C45,
0
0.022 μF CAP, CERM, 0.022 μF, 50
C71, C72
V, ±10%, X7R, 0402
FID1, FID2,
0
Fiducial mark. There is
FID3, FID4,
nothing to buy or mount.
FID5, FID6
R5, R11
0
10.0 k
RES, 10.0 k, 1%, 0.1 W,
0402
SLUUCK6 – DECEMBER 2021
Submit Document Feedback
Table 9-1. TPSM8D624EVM-2V0 Bill of Materials (continued)
PackageReference
603
Shunt
SMB Connector
TH, 2-Leads, Body 10
×10mm, Pitch 5 mm
7.0 × 8.2 × 6.5 mm
Red Multipurpose Testpoint
Black Multipurpose Testpoint 5011
White Multipurpose Testpoint 5012
MODULE_MOW0059A
1210
402
N/A
402
Copyright © 2021 Texas Instruments Incorporated
PartNumber
Manufacturer
CRCW06031K00FKEA
Vishay-Dale
SNT-100-BK-G
Samtec
SMBR004D00
JAE Electronics
282856-2
TE Connectivity
ED555/2DS
On-Shore
Technology
5010
Keystone
Keystone
Keystone
TPSM8D6x24MOW59
Texas Instruments
GRM32ER71A476KE15L
MuRata
GRM155R71H223KA12D
MuRata
N/A
N/A
ERJ-2RKF1002X
Panasonic
Bill of Materials
Alternate
Alternate
PartNumber
Manufacturer
969102-0000-
3M
DA
Texas
Instruments
TPSM8D6C24EVM-2V0 User's Guide
21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPSM8D6C24EVM-2V0 and is the answer not in the manual?

Table of Contents