Texas Instruments TPSM82843 EVM-057 Series User Manual

Texas Instruments TPSM82843 EVM-057 Series User Manual

Evaluation module

Advertisement

www.ti.com
EVM User's Guide: TPSM82843678EVM-057
TPSM82843xEVM-057 Evaluation Module
Description
The TPSM82843xEVM-057 facilitates the evaluation
of the TPSM82843x family of 600mA, step-down
converter power modules with 275nA I
2.65mm x 1.27mm QFN packages. The EVM contains
three separate circuits to create output voltages
between 0.4V and 3.6V from higher input voltages
between 1.8V and 5.5V. The TPSM82843x is a highly
efficient and tiny device module for point-of-load
(POL) converters for space-constrained applications.
Get Started
1. Order the TPSM82843678EVM-057.
2. Download the
TPSM82843 data
3. Use data sheet or WEBENCH
output voltage.
SLUUD41 – AUGUST 2024
Submit Document Feedback
Features
in 2.45mm ×
Q
sheet.
®
to modify the
Applications
TPSM82843xEVM-057 Hardware (Top View)
Copyright © 2024 Texas Instruments Incorporated
Input voltage range: 1.8V to 5.5V
Output voltage range: 0.4V to 3.6V
275nA typical quiescent current
600mA output current
1% output voltage accuracy
4nA typical shutdown current
Active output discharge
Low output voltage ripple in power save mode
RF-friendly and fast transient DCS-Control
Automatic transition to no ripple 100% mode
VSET pin-selectable output voltage through a
single resistor
– TPSM828436: 0.4V to 0.8V
– TPSM828437: 0.8V to 1.8V
– TPSM828438: 1.8V to 3.6V
Wearable electronics
Headsets, headphones, and ear buds
Mobile phones
Medical sensor patches
Hearing aid
TPSM82843xEVM-057 Evaluation Module
Description
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPSM82843 EVM-057 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPSM82843 EVM-057 Series

  • Page 1 Applications • Wearable electronics • Headsets, headphones, and ear buds • Mobile phones • Medical sensor patches • Hearing aid TPSM82843xEVM-057 Hardware (Top View) SLUUD41 – AUGUST 2024 TPSM82843xEVM-057 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 2: Kit Contents

    100μA load current and below. 18 pre-defined output voltages can be selected by connecting a resistor to the VSET pin, making the family usable across various applications with a minimum set of passive components. TPSM82843xEVM-057 Evaluation Module SLUUD41 – AUGUST 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 3 However, such a small size is difficult to replace. Therefore, Rx2/Rx3 is provided in an 0603 size to change the output voltage easily. Simply remove Rx1 and place the desired value to Rx2/Rx3. SLUUD41 – AUGUST 2024 TPSM82843xEVM-057 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 4 600mA, 275nA I , Step-Down Converter with Integrated Inductor in QFN Package data sheet. See the data sheet for the performance of this EVM. TPSM82843xEVM-057 Evaluation Module SLUUD41 – AUGUST 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 5 10uF 10uF 4.7uF 10uF VSET TPSM828438VCF R GND2 GND2 249k JP31 VIN2 GND2 GND2 GND2 JP33 44.2k 10.0k GND2 GND2 Figure 4-3. TPSM828438 Schematic SLUUD41 – AUGUST 2024 TPSM82843xEVM-057 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 6: Pcb Layouts

    Hardware Design Files www.ti.com 4.2 PCB Layouts This section provides the TPSM82843xEVM-057 board layout and illustrations in Figure 4-4 through Figure 4-6. Figure 4-4. Top Assembly TPSM82843xEVM-057 Evaluation Module SLUUD41 – AUGUST 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 7 Hardware Design Files Figure 4-5. Top Layer Figure 4-6. Bottom Layer SLUUD41 – AUGUST 2024 TPSM82843xEVM-057 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 8: Bill Of Materials

    Module, QFN 5 Additional Information 5.1 Trademarks WEBENCH ® is a registered trademark of Texas Instruments. All trademarks are the property of their respective owners. TPSM82843xEVM-057 Evaluation Module SLUUD41 – AUGUST 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 9 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 10 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 11 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 12 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 13 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 14: Important Notice

    TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2024, Texas Instruments Incorporated...

This manual is also suitable for:

Tpsm82843678evm-057

Table of Contents